Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 34

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Performance test of J-PARC 324 MHz klystrons

Fuwa, Yasuhiro; Shinozaki, Shinichi; Chishiro, Etsuji; Hirane, Tatsuya; Fang, Z.*; Fukui, Yuji*; Futatsukawa, Kenta*; Mizobata, Satoshi*; Iwama, Yuhei*; Sato, Yoshikatsu*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.611 - 613, 2019/10

In the J-PARC linac, a proton accelerator is operated using 45 units of 324 MHz and 972 MHz klystrons. In the future stabilization and advancement of the accelerator, it is important to acquire the klystron output characteristics near the maximum output accurately. In order to understand this characteristics, measurement of the characteristics of the replaced klystron for some reason such as discharge, as well as the new klystron. However, such measurements have not been performed because of the risk of damage including peripheral equipment due to discharge and the temporal interference with the operation of the accelerator. Therefore, we set up a klystron test stand in the linac building and measured the high-voltage characteristics and input/output characteristics of the klystron under various operating parameters. By using this measurement result, the characteristics of klystron can be obtained before installation, and it becomes possible to determine the optimum operation parameters and make effective plan of klystron replacements. In addition, basic data for predicting the degradation tendency of klystron was acquired by comparing the characteristics of the used and used klystron.

Journal Articles

Improvement of inner surface inspection system for superconducting cavities applying image processing technique

Kuriyama, Yasutoshi*; Iwashita, Yoshihisa*; Hirota, Katsuya*; Hayano, Hitoshi*; Fuwa, Yasuhiro

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.32 - 35, 2019/10

Research and development of gradient enhancement of superconducting RF accelerating cavity is carried out by accelerator research institute in the world, but defects on the cavity surface limit accelerating electric field. Therefore, development of "Inside inspection system for superconducting accelerated cavity" that optically visualizes the state of the inner surface of the superconducting cavity has been carried out, and results have been achieved. In this research, we apply image processing technology that has developed remarkably in recent years to the internal inspection system, and advanced the defect recognition method. Extraction of depth information and image synthesis were performed from images obtained with different focal positions with the camera for internal surface inspection. Also, by performing pattern recognition processing on the images, automatic detection of defects has become possible. By integrating these techniques into the cavity inner surface inspection system, it becomes possible to shorten the scan time for defect search and acquire the defect shape.

Journal Articles

Improvement of correction magnets with permanent magnets

Abe, Masashi*; Iwashita, Yoshihisa*; Terunuma, Nobuhiro*; Fuwa, Yasuhiro; Yako, Tomoki*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.700 - 702, 2019/10

Application of permanent magnets to the damping ring of International Linear Collider (ILC) is investigated. Replacing electromagnets with permanent magnets can reduce not only electricity for exciting the coils and maintenance cost of power supplies but also leakage accidents of cooling water. Bending magnets and correction magnets are used in damping ring, but we tried to calculate magnetic field distributions in a correction magnets using permanent magnets with 3D magnetic field code CST studio. The orbit correction magnet requires that the polarity and the intensity of the generated magnetic field be variable in order to correct the beam orbit error. In this research, adjustment of the generated magnetic field was made possible by mounting the rotation mechanism on the permanent magnet in the magnetic circuit in the correction magnet. In addition, in order to suppress deterioration of beam quality due to an incorrect multipole magnetic field, optimization of the shape of the magnetic circuit was performed, and a magnet design that could be installed on a accelerator was established.

Journal Articles

Measurement of radiation resistivity of ferrite permanent magnets irradiated by neutrons

Yako, Tomoki*; Iwashita, Yoshihisa*; Abe, Masashi*; Kurihara, Toshikazu*; Fukuda, Masafumi*; Sato, Masaharu*; Sugimura, Takashi*; Fuwa, Yasuhiro; Takamiya, Koichi*; Iinuma, Yuto*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1003 - 1005, 2019/10

Permanent magnets are used as materials for beam optics elements, but it is known that radiation demagnetization occurs in neodymium magnets and samarium cobalt magnets. However, there is not enough information on the radiation demagnetization of ferrite magnets which is weak in strength but inexpensive. In order to verify the suitability of the ferrite magnet as a beam optics element, radiation demagnetization experiments by neutron irradiation of the ferrite magnet were carried out at the Kyoto University Research Reactor (KUR). In the experiment, neutron fluence up to $$10^{17}$$cm$$^{-2}$$ was irradiated, and no significant demagnetization was detected on the fluence.

Journal Articles

Applying neural networks to investigations of the influence of weather conditions on the power consumption of J-PARC

Nomura, Masahiro; Tamura, Fumihiko; Shimada, Taihei; Yamamoto, Masanobu; Furusawa, Masashi*; Sugiyama, Yasuyuki*; Hara, Keigo*; Hasegawa, Katsushi*; Omori, Chihiro*; Yoshii, Masahito*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.258 - 261, 2019/07

In recent years, summer temperatures have tended to increase, so understanding the amount of power consumption in summer from weather information has become important in terms of contract power and power saving measures. The relationship between the amount of power consumption and weather conditions is that the accelerator facility has many cooling facilities, so it can be thought that the amount of power used to cool each device increases as the temperature and humidity increase. It seems that it has not been investigated specifically what kind of dependence there is. Therefore, considering the neural network as a kind of fitting function or a model of calculation, we investigated the influence of weather conditions on the power consumption. As a result, it was found that the power consumption of the accelerators mostly depends only on the temperature, and the electric power of Linac and RCS increases by about 1 MW when the temperature of Mito rises by 10$$^{circ}$$C.

Journal Articles

The Residual dose distribution and worker doses in J-PARC 3GeV rapid cycling synchrotron

Yamamoto, Kazami

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.333 - 337, 2019/07

J-PARC 3GeV Synchrotron (RCS) started beam commissioning in 2007. The beam commissioning has been continued to increase the beam power for users. In a high-intensity hadron accelerator such as J-PARC, it is essentially important to reduce the activation due to beam loss and to suppress the exposure of workers. For this purpose, RCS has continued to study and countermeasure for the causes of beam loss from the initial stage of beam commissioning. At present, stable user operation is continuing at 500 kW. This value is half the design beam power of 1 MW, and the residual doses are being maintained enough small so that the maintenance work does not be hindered. In this report, we will introduce the history and measures of the residual doses in RCS so far, and the situation of the exposure dose of workers during maintenance work.

Journal Articles

Development of the new method to utilize the titanium vacuum chamber as a vacuum pump

Kamiya, Junichiro; Hikichi, Yusuke*; Wada, Kaoru*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1189 - 1192, 2019/07

Non-evaporable getter (NEG) coating, which was developed at CERN, is the breakthrough method, which makes a beam pump a vacuum pump by coating a getter material on the beam pipe surface. The usage of the NEG coating has widely spread in the accelerators in recent years. On the other hand, J-PARC uses titanium, which is a low activation material, as a material for the beam pipe. If the titanium oxide on the surface can be removed, the titanium beam pip plays the role of the vacuum pump because the pure titanium is a getter material. In this presentation, we report on the method of oxide film removal by the sputtering method and vacuum performances of the titanium vacuum chamber as the getter pump.

Journal Articles

Fabrication status of charge stripper foil for 3 GeV synchrotron of J-PARC

Nakanoya, Takamitsu; Yoshimoto, Masahiro; Yamazaki, Yoshio; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.545 - 549, 2019/07

In the 3 GeV Rapid Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research complex (J-PARC), we adopted the carbon stripper foil for the multi-turn H- charge exchange injection. The charge exchange foil which use in RCS is fabricated by the arc discharge method with the boron doped carbon electrode. The foil fabricated this method is called HBC foil (Hybrid Boron mixed Carbon stripper foil). HBC foil had been developed at KEK. It has high durability for the beam irradiation damage. In past days, the foil fabrication process was conducted in KEK Tsukuba-site and the foil preparation process was conducted in JAEA Tokai-site. In 2017, the foil deposition apparatus has been relocated from KEK to JAEA, and we started both processes in Tokai-site. We carried out the offline beam irradiation test for the new HBC foil which fabricated in JAEA, and we confirmed that its performance is equivalent to the original HBC foil. Next we tested a new HBC foil with actual beam in RCS and we confirmed it could withstand 1 week beam irradiation. After that, we started user operation with the new HBC foil in 2018. So far we accomplished stable user operation for one year by using the new HBC foil only.

Journal Articles

Next generation timing system for J-PARC

Tamura, Fumihiko; Takahashi, Hiroki; Kamikubota, Norihiko*; Ito, Yuichi; Hayashi, Naoki

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.149 - 152, 2019/07

Precise timing pulses from the timing system are necessary for acceleration of high intensity proton beams in the J-PARC accelerators. The existing timing system was developed during the construction period of the J-PARC. The system has been working well for more than ten years, however, the optical modules for the signal transfer from the central control building to the accelerators are discontinued already. Although we have spares of the optical devices, maintenance of the system will be difficult. Therefore, we are developing the next generation timing system for the J-PARC. We present the design of the system, preliminary test results, and future plans.

Journal Articles

Recent progress of the J-PARC RCS beam commissioning and operation; Efforts to realize a higher beam power beyond 1 MW

Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.574 - 578, 2019/07

no abstracts in English

Journal Articles

Present status of personnel protection system at J-PARC

Kikuzawa, Nobuhiro; Niki, Kazuaki*; Yamamoto, Noboru*; Hayashi, Naoki; Adachi, Masatoshi*; Watanabe, Kazuhiko*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.877 - 880, 2019/07

Interlock system of J-PARC is classified into a personnel protection system (PPS) for human safety and a machine protection system (MPS) for protecting equipment. The PPS of the J-PARC accelerator started from the operation at Linac in 2006 and was completed by the MR operation in 2008. In the next 10 years, some improvements have been made, such as updating video monitoring systems and establishing new interlocks. In addition to describing recent operations including these updatings, this paper reports the current status of inspections and maintenance conducted to maintain and improve reliability.

Journal Articles

Beam monitor data analysis of interlocked events at J-PARC RCS

Hayashi, Naoki; Yoshimoto, Masahiro; Moriya, Katsuhiro; Hatakeyama, Shuichiro*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1096 - 1100, 2019/07

It is necessary to understand the reason why the accelerator has been interrupted due to beam loss or other machine mal function in order to keep high availability in long term period. At J-PARC RCS, 25 Hz rapid-cycling synchrotron, there is a system to record beam intensity and beam loss monitor signal for all pulses with 10 ms period. At this time, in addition, new system to archive data with better time resolution if interlocked events occurred has been introduced. Using these archived data, the events only RCS BLM gives MPS have been analyzed and it turns out that these events are related to the ion source discharge which makes very low intensity within less than a second. In this paper other typical events are presented and discuss how to improve the accelerator performance in future.

Journal Articles

Development of two-mirror multi-pass laser system to reduce laser power for laser stripping injection at J-PARC 3-GeV RCS

Saha, P. K.; Harada, Hiroyuki; Kinsho, Michikazu; Sato, Atsushi*; Yoneda, Hitoki*; Michine, Yurina*

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.841 - 845, 2019/07

Journal Articles

Investigation for tiny metal contamination of water cooling system in J-PARC Linac

Suganuma, Kazuaki; Hiroki, Fumio; Ito, Takashi; Yamazaki, Yoshio

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.846 - 848, 2019/07

In the past, water flow decreased at water cooling system in J-PARC Linac. Contamination get mixed in cooling water. The problem was resolved by changing the system of the circulation pumps and reducing the tiny metal in water cooling system. However, suppression of occurring tiny metal is unresolved. The tiny metal is the unique problem of accelerator. It is caused by heavy using oxygen free copper and phosphorus deoxidized copper. The two copper is used for the part of accelerator and purified water. The object of the report is investigation of tiny metal contamination of water cooling system in J-PARC Linac.

Journal Articles

Design of an SRF linac for accelerating muon

Otani, Masashi*; Kondo, Yasuhiro; Tamura, Jun

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.566 - 568, 2019/07

A muon linac has been developed to generate a low emittance muon beam. Because muons have finite life time of 2.2 $$mu$$sec and the beam current is negligible, a superconducting radio-frequency (SRF) accelerator is suitable for accelerating the muon beam. Basic designs of an SRF linac with 1.3 GHz elliptical cavities to accelerate muons from $$beta$$ = 0.69 to 0.94 was carried out. Although the emittance growth is about 20 to 70%, the SRF muon linac is feasible.

Journal Articles

Bunch size measurement with high time resolution for RF accelerated muon beam

Sue, Yuki*; Iijima, Toru*; Inami, Kenji*; Yotsuzuka, Mai*; Iinuma, Hiromi*; Nakazawa, Yuga*; Otani, Masashi*; Kawamura, Naritoshi*; Shimomura, Koichiro*; Futatsukawa, Kenta*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.55 - 60, 2019/07

The result of bunch size measurement of muon accelerated by RFQ up to 89 keV is presented in this paper. A four-stage muon linac for precise measurement of muon property is under construction in the J-PARC. The demonstration of the first muon RF acceleration with an RFQ linac was conducted and the transverse profile of the accelerated muons was measured in 2017. As one of the remaining issues for the beam diagnostic system, the longitudinal beam profile after the RFQ should be measured to match the profile to the designed acceptance of the subsequent accelerator. For this purpose, the new longitudinal beam monitor using the microchannel plate is under development. The time resolution of the monitor aims to be around 30 to 40 ps corresponding to 1% of a period of an operating frequency of the accelerator, which is 324 MHz. On November 2018, the bunch size of accelerated negative muonium ion of 89 keV with the RFQ was measured using this monitor at the J-PARC MLF. The measured bunch width is $$0.54pm0.13$$ ns, which is consistent with the simulation.

Journal Articles

Development of the longitudinal beam profile monitor with high time resolution for realization of low-emittance muon beam in the J-PARC E34 muon g-2/EDM experiment

Yotsuzuka, Mai*; Iijima, Toru*; Iinuma, Hiromi*; Inami, Kenji*; Otani, Masashi*; Kawamura, Naritoshi*; Kitamura, Ryo; Kondo, Yasuhiro; Saito, Naohito; Shimomura, Koichiro*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.814 - 817, 2019/07

The J-PARC E34 experiment aims to measure the muon anomalous magnetic moment and the electric dipole moment with a high precision. In this experiment, thermal muonium is produced and ionized by laser resonance to generate ultra-slow muons, which are then accelerated in a multistage muon linac. In order to satisfy the experimental requirements, suppression of the emittance growth during the acceleration is necessary. Because the main cause of the emittance growth is beam mismatching between the accelerating stages, the transverse and longitudinal beam monitoring is important. The longitudinal beam monitor has to measure the bunch length with the resolution equivalent to tens of picoseconds, which is 1% of the acceleration phase of 324 MHz. In addition, it should be sensitive to single muon because the beam intensity is limited during the commissioning phase. To realize above requirements, we are developing a longitudinal beam monitor with a micro channel plate, and the test bench to evaluate the monitor performance. So far, the time resolution of the beam monitor was obtained to be 65 ps in RMS including the jitter on the test bench. We also succeeded in measuring the longitudinal bunch size of the muon beam accelerated by RFQ using the beam monitor. In this paper, the results of the performance evaluation for this beam monitor are reported.

Journal Articles

Development of RF input coupler for Inter-digital H-mode drift-tube linac prototype with alternative phase focusing in muon linac

Nakazawa, Yuga*; Iinuma, Hiromi*; Iwashita, Yoshihisa*; Iwata, Yoshiyuki*; Otani, Masashi*; Kawamura, Naritoshi*; Kitamura, Ryo; Kondo, Yasuhiro; Saito, Naohito; Sue, Yuki*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.404 - 407, 2019/07

An inter-digital H-mode drift-tube linac (IH-DTL) is developed in a muon linac at the J-PARC E34 experiment. IH-DTL will accelerate muons from 0.34 MeV to 4.5 MeV at a drive frequency of 324 MHz. Since IH-DTL adopts an APF method, with which the beam is focused in the transverse direction using the rf field only, the proper beam matching of the phase-space distribution is required before the injection into the IH-DTL. Thus, an IH-DTL prototype was fabricated to evaluate the performance of the cavity and beam transmission. As a preparation of the high-power test, tuners and coupler are designed and fabricated. In the low power measurement, we decided the loop structure with witch the VSWR = 1.01 and field distortion of within 7%. In this paper, the development of the tuner and the coupler and the result of the low-power measurement will be presented.

Journal Articles

J-PARC muon g-2/EDM experiment; Development of the spin rotator for the low emittance muon beam

Yasuda, Hiromasa*; Iinuma, Hiromi*; Otani, Masashi*; Kawamura, Naritoshi*; Kitamura, Ryo; Kondo, Yasuhiro; Saito, Naohito; Sue, Yuki*; Nakazawa, Yuga*; Matoba, Shiro*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.371 - 375, 2019/07

Muon linac is developed for the muon g-2/EDM experiment at J-PARC. In this experiment, ultra slow muon is accelerated to a momentum of 300 MeV/c with the four linac structures. This scheme offers new opportunity for precise measurements; it enables us to reverse muon polarization at early stage of acceleration. The reversal of polarization is a common method of precision polarization measurements as it can be used to identify or reduce systematic uncertainties dependent on time. It is necessary to accelerate muons and flip its spin without substantial emittance growth for the experimental requirement. As one of the candidates for our spin rotator, we are developing the Wien-filter type. The emittance growth is +64% in x-x' plane and +56% in y-y' plane, but it is revealed it would be reduced by tuning electric field to + 47% in x-x' plane and + 2% in y-y' plane. In this paper, the design of the Wien-filter type spin rotator for the low emittance muon beam will be presented.

Journal Articles

Present status of JAEA-Tokai tandem accelerator

Matsuda, Makoto; Osa, Akihiko; Ishizaki, Nobuhiro; Tayama, Hidekazu; Kabumoto, Hiroshi; Nakamura, Masahiko; Kutsukake, Kenichi; Otokawa, Yoshinori; Asozu, Takuhiro; Matsui, Yutaka; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1270 - 1273, 2019/07

The JAEA-Tokai tandem accelerator was operated over a total of 138 days, and delivered 16 different ions to the experiments in the research fields of nuclear physics, nuclear chemistry, atomic physics, solid state physics and radiation effects in material in FY2018. Maximum acceleration voltage was 16.6 MV. A new beam attenuator was installed at the entrance beam line of the tandem accelerator to facilitate control of the beam current and minimize stripper foil consumption. The main maintenance items included replacing the pellet chain used for about 68,000 hours and the drive motor for the high voltage terminal generator used for about 9 years. A fault has occurred in the building's oxygen deficiency monitor. This paper describes the operational status of the accelerators and the major technical developments of our facility.

34 (Records 1-20 displayed on this page)